• COMPLETION YEAR :
  • CATEGORY : Culture
  • VISUALIZATION :
Fine Arts Museum

Agravitas

View More

  • COMPLETION YEAR :
  • CATEGORY : Culture
  • VISUALIZATION :

Other proposals

Our design will restore the existing mid-twentieth century building and setting to its original glory, create a new publicly accessible atrium space and add major new galleries for contemporary art in a floating pavilion.

The overhaul of the Bilbao Fine Arts Museum was designed to restore its original facade and internal configuration and make the «1945 building the primary protagonist». The pavilion-like rooftop extension will provide 2,000-square-metres of flexible gallery spaces above it.

The extension, supported by slender columns, will rest on top of the 1945 brick building and its 1970 extension at the rear, overhanging the Plaza Arriaga that separates them.

This plaza will then be lined with glass to meet the overhang of the extension, forming a new enclosed lobby that will become the heart of the museum. It is hoped this will enhance the buildings permeability.

Once complete, the lobby will be lit by a giant cylindrical skylight that punctures the extension, which will also provide glimpses up into the new gallery spaces.

Facts and figures

  • COMPLETION YEAR :
  • CATEGORY : Culture
  • VISUALIZATION :

LOCATION

Bilbao

 

APPOINTMENT

2019

 

CLIENT

Fundación Museo de Bellas Artes de Bilbao

 

AREA

5.000,00 m2

 

PRESS RELEASES

Arquitectura Viva
Plataforma Arquitectura
Competition Online
AD Architectural Digest
Metalocus
Dezeen

Partners

  • COMPLETION YEAR :
  • CATEGORY : Culture
  • VISUALIZATION :

Architects

Norman Foster
Luis María Uriarte

 

Rigger

Arkaitz Amuriza

 

Historian

Estrella de Diego

 

LMU ARKITEKTURA Team

Ana Martín
Luis Solachi

 

Foster + Partners team

Nigel Dancey
Taba Rasti
Pablo Urango
Roger Ridsdlll
Piers Heath
Martha Tsigkari
Leire Calvillo
Emilio Ortiz
Lucas Mazarrasa
Jaime Valle
Alex Duro